Scope of the Work
a) To carry out site-visits and consult with the people and dwellers for developing road map for smooth implementation of the project.
b) To fix the watershed boundary in the field.
c) To identify the length, size and types of drainage structures for safe drainage of the watershed.
d) To identify the locations for different types of walk ways, their length and numbers
e) To identify the location of vegetative EMPs.
f) To identify the location of water harvesting structures and the requirement of water conservation.
g) To address the landslide problems and suggesting need of detail slope stability analysis and implementing additional landslide prevention measure.
h) To prepare detailed design of various structures.
i) To prepare detailed estimates for EMP’s and various other structures as per Govt. rates.
Implementation strategy of the project: